CLUFF BROTHERS DRILLING · SEVIER COUNTY

Water-well drilling
in Richfield, Utah

Your property. Your plans. A clear place to start. Share your location, intended water use and timeline with Cluff Brothers Drilling to discuss your project.

A well-drilling conversation starts with your Richfield property.

Richfield is in Sevier County. Send the parcel location and purpose of the proposed well before making assumptions about travel coverage or scheduling.

If Richfield is the nearest town for property elsewhere in Sevier County, identify the actual site and travel route. Explain the intended water use, available work area and preferred timeline. Availability must be confirmed for the specific request.

An unbranded truck-mounted well-drilling rig on a desert work pad.
PLAN YOUR PROJECT

Bring the details that matter.

Open sagebrush land with distant mountains.

Actual site location within Sevier County

Start with the precise location so coverage and next steps can be discussed for the actual site.

Explore water-well drilling →
A gravel property entrance and open farm gate.

Travel route and equipment access

Describe the entrance, approach route and any known restrictions. Ask what additional information is needed.

Explore water-well drilling →
Site-planning tools and a hard hat on a workbench.

Intended use, work area and timing

Explain your goals and preferred schedule. Availability and scope need a direct conversation.

Explore water-well drilling →
PROPERTY-FIRST PLANNING

Four details worth discussing early.

01

Exact location

An address or parcel reference is more useful than a regional description alone.

02

Site access

Describe the entrance, approach route, gates and known restrictions.

03

Intended use

Explain your goals without assuming any particular water quantity or quality can be promised.

04

Clear expectations

Ask about confirmed coverage, availability, scope and what comes next.

FROM THE FIELD

A closer look at the work.

Steel drill pipes in a storage rack.
A gravel property entrance and open farm gate.
An unbranded truck-mounted well-drilling rig on a desert work pad.
FAQ

Richfield well-drilling questions

What should I verify before drilling a well near Richfield?

Identify the parcel's water-right area and the approved source of water. For the Central Sevier River area, the Division's published policy directs applicants to the Sevier River Basin groundwater management plan and notes restrictions on new appropriations. Contact the Sevier River regional office with the parcel and proposed use rather than assuming undeveloped land comes with permission to pump groundwater.

Central Sevier policy

Can I use an irrigation right for a year-round home well?

That requires a specific review. The Sevier River Basin policy evaluates changes from seasonal uses to year-round uses individually, including effects on other rights. Before buying a right, confirm its existing season, source, place of use and whether the proposed change is feasible. A matching annual quantity alone does not establish that it will work for a home.

Sevier River Basin policy

Does water-right approval also approve my building or septic plan?

No. The Division specifically cautions Central Sevier applicants to obtain other applicable approvals. Check the city or county and local health requirements while the well location is being planned. A site layout that works for water rights still needs to work for the property's buildings, wastewater system, utilities and drilling access.

Area 63 approval guidance

What should I compare in well records around a Richfield-area parcel?

Look at more than total depth. Compare the location, ground elevation if available, date, construction and recorded water levels or production observations. Keep valley-floor and hillside records separate when judging how relevant they may be. Bring the records to the estimate discussion as background, not as a guarantee that your well will have the same result.

How do I plan a well for both a Richfield-area home and livestock?

List the household use, number and type of animals, and any irrigated land separately. Explain whether needs are year-round or seasonal and whether another source already serves part of the property. This gives the drilling and water-right discussions the same starting point and helps avoid scoping a domestic project around an unstated farm demand.

Let’s talk about your Richfield property.

Start with the location, intended water use and timing you have in mind. Confirm coverage and availability for your specific parcel before making plans.